As part of a major overhaul of Edinburgh’s world famous Usher Hall, Black Light designed and installed an innovative lighting scheme for the venue’s iconic dome. The key project requirement was that all aspects of the scheme should be hidden from view when not in use. Using out-of-the-box thinking and state-of-the-art automation technology, we solved this challenge to produce a bespoke solution that fitted the clients’ brief exactly.

Key Details:

Service Type: Installations

Sector: Architectural 

Completion: October 2010

Client: City of Edinburgh Council

What we did

The system we designed and installed comprises of 14 light fittings mounted on self-erecting masts. The masts are deployed using a pneumatic system similar to that used by American fire and rescue trucks. Key project steps included:
  • Design and Consultancy - the project involved a number of unique challenges which required extensive research and feasibility studies. Key technology was sourced from the USA.
  • Installation - the installation of the new lighting system involved the set up of custom mountings on the roof of the Usher Hall. We also installed control cabling, a weather -monitoring- station and other associated systems and interfaces.
  • Commissioning - the system was carefully tested and programmed and then handed over to the client.

Result

We met and exceeded all project goals. The system is fully autonomous and has a manual override and emergency functions built in. The 14 masts each occupy no more than 0.5m x 1.8m of roof space. When deployed the lights rise 5m above roof level and create a stunning spectacle out of the high-level rooftop and copper dome.

The system deploys automatically at dusk and turns off again at two in the morning. The turn-off is designed to save money and reduce the carbon footprint of the scheme.

The system is also protected by a monitoring system that shuts it down if the weather exceeds safety levels.

Feedback

The client and project architect are delighted with the installation which is working flawlessly and to great effect.

The Venue

The historic Usher Hall has been the subject of a multi-million pound redevelopment programme since 2000. The new lighting system we installed was part of the final step of Phase Three of this development programme.

Equipment

  • Mosaic Control System - overall operation of the scheme and interfacing.
  • 14no custom pneumatic masts with control units and power supplies.
  • 14no Erco Super-wide architectural light fittings with CDM250 colour-referenced lamp to Consultant Specification.
  • Weather station with alarm interface and serial control.
  • POE switch for data and control routing to masts.

Share this article :


Email this ArticlePrint this Article


Installations_small

Installations

Whatever you need - be it a new lighting rig, full Dolby surround sound or an AV system.

Find out more

Browse by industry

Browse by service