What are you looking for? Case Studies News Products


Listing 31 items in
Service: Installations | Sector: ALL

Refine your Case Study search results by:
Natwest%201

CASE STUDY

Natwest Store Birmingham

We created a dynamic effect for Natwest Super Flagship store in Birmingham. We used project mapping with a pixelated façade for the end product. 


Albany%20hotel%20(web)

CASE STUDY

Albany Hotel

 Black Light installs affordable interior and exterior lighting solution for an Edinburgh City Centre boutique hotel.

We were commissioned to replace the original, non-functioning exterior lights whilst adding some additional lighting in the entrance foyer to highlight ceiling architecture



Manchester%20first%20street%20(2)

CASE STUDY

Manchester First Street

Black Light create a low resolution LED video facade on a new build car park at Manchester First Street.

We were chosen for this project as a qualified and trusted supplier and installer of Traxon LED products, who also offered the best value solution with the required skill-set  to complete the project.


Emirates-11--website

CASE STUDY

Arsenal Armoury

We have continued our successful partnership with Arsenal football club by outfitting its flagship shop with the latest in sound and AV technology. The success of the project at the Armoury store showcases our technical expertise and creativity and shows that we can deliver exceptional installations that bring interactivity and excitement to the retail environment.


Strathallan-web%201

CASE STUDY

Strathallen School, Perthshire

We completed one of the first all-LED theatrical lighting installs in a school in Scotland. The success of the project, at Strathallen School in Perthshire, highlights both our expertise with this energy-saving technology and our experience working closely with clients in the education sector to provide them with the technical and creative solutions they need.


Lasswade%20_%20eastwood-web

CASE STUDY

Schools for the Future

We installed a wide range of stage, lighting and sound equipment at two Scottish schools, as part of the government’s flagship Schools for the Future Programme.

The success of the two projects shows that we have the expertise to be involved in groundbreaking initiatives involving key decision makers in both government and education. It also highlights our ability to create multi-purpose spaces in a school environment.


Dsc_0010-for-web

CASE STUDY

Tennent's Wellpark Brewery

The nine large metallic tanks that stand in the grounds of Tennent Caledonian’s Wellpark Brewery in Glasgow are a well-known industrial landmark. Black Light replaced the old architectural lighting system that illuminated the tanks and also installed an external video projection system. The success of the project highlights our expertise on large-scale exterior lighting schemes. 


Bl%20huxley%20327

CASE STUDY

The Rutland Hotel

The Rutland Hotel is a well-known establishment located in a very prominent position at the west end of Princes Street in Edinburgh. We were asked to design and install new exterior lighting for this landmark building.
 
Our solution used innovative and discrete technology and provided the flexibility and performance the client required. Its success highlights our expertise in high-profile architectural commissioning.


Thearsenalshop149570%20-%20signpost

CASE STUDY

Arsenal Football Shop

We delivered a state-of-the-art audio and video system for the Arsenal
Football Club shop at London’s Brent Cross Shopping Centre. The success of
the system, which provides a high-tech marketing centerpiece for the prestigious
store, shows that we have the capability to work in London and deliver a pristine
installation to a high-profile client.


Black-light---case-study---st.-andrews-and-st-george's-church-2

CASE STUDY

St Andrew's & St George's West

Black Light has designed and installed an innovative, high-quality audio-visual system for one of Edinburgh’s most historic churches.

The system, which features Tannoy Loudspeakers and two long-throw projectors, was installed in the church of St Andrew’s and St George’s West. It highlights our expertise at working in architecturally important buildings and our skill at using the latest technology to provide cost-effective solutions that exceed client expectations.


Black-light---case-study---scifi---signpost

CASE STUDY

EISF

In one of Black Light’s more unusual (but most magical) projects, our team was asked to suspend a giant balloon sculpture high up in the atrium of the Grand Gallery of the National Museum of Scotland. The sculpture was one of the highlights of the Edinburgh International Science Festival. Our involvement shows that we are trusted by our clients to come up with innovative technical solutions to even the most unexpected of challenges.


Dsc_0028

CASE STUDY

Glasgow Hydro

Glasgow’s SSE Hydro is one of the most exciting new music and sport venues in the UK. Black Light was asked to supply, install and commission high-spec, integrated LED and AV systems in the venue’s two VIP rooms – the Wind and Water Suites.

The success of this prestigious project demonstrates our ability to work to the highest specifications along with our competence at AV integration, including AMX system programming, eCue System Programming and commissioning works.


Img_6109

CASE STUDY

The Sage, Gateshead

We replaced the house lighting for two auditoriums within the Sage Gateshead, one of the UK’s leading music venues.


Dsc_0238

CASE STUDY

National Mining Museum

Service: Installations

Sector: Education

We created two dramatic lighting installations at the National Mining Museum Scotland.


Dsc_0069

CASE STUDY

Virgin Money

Service: Installations | Architectural

Sector:

We installed and programmed a cutting-edge light installation at the prestigious new headquarters of Virgin Money in St. Andrews Square, Edinburgh.


312

CASE STUDY

Glasgow Transport Museum

We designed and installed the lighting installations on a number of high-profile exhibits at the new Glasgow Transport Museum.


Kinross-hs-2410

CASE STUDY

Perth and Kinross Council

We worked with contractors to provide state-of-the-art, cinema and theatre equipment installed in six schools in Perth and Kinross.


Dscn0303

CASE STUDY

York St. John University

Service: Installations

Sector: Education

We installed the lighting, sound and audiovisual equipment in the revamped performance venue at York St John University.


Img-20121105-00252

CASE STUDY

St. John’s Kirk, Perth

We successfully installed a full-package of AV, audio and lighting equipment (and associated control systems) within a high profile and historically significant town-centre Kirk.


Nisa-070

CASE STUDY

Sir Chris Hoy Velodrome

We designed, installed and programmed a large-scale LED architectural lighting system for the facade of the new Sir Chris Hoy Velodrome in Glasgow.


Black-light-case-study-placeholder-2

CASE STUDY

Tramway

We replaced and upgraded the house lighting system at Tramway, one of Glasgow’s leading performance and event venues.


Close-lit-3

CASE STUDY

The Real Mary King's Close

We created a new lighting scheme for a ‘Supernatural’ tour at the Real Mary King’s Close tourist attraction in Edinburgh.


_mg_0689

CASE STUDY

Usher Hall

We designed and installed an innovative lighting scheme for the iconic dome of Edinburgh’s Usher Hall.


Img_0370

CASE STUDY

The Sage, Gateshead

We renewed the auditorium dimmer system at The Sage Gateshead, one of the UK’s leading music venues.


Exterior%20sign

CASE STUDY

Telford College

Service: Installations

Sector: Education

We played a key role in the development of a new performing arts studio at Edinburgh’s Telford College.


Img_7052

CASE STUDY

South Lanarkshire Council

Service: Installations

Sector: Education

We installed theatre sound and light systems in ten schools in South Lanarkshire.


Img_0921

CASE STUDY

Alloa Town Hall

We provided a full package of lighting and sound equipment for Alloa Town Hall.


Img_0457v3

CASE STUDY

The Maltings Theatre

We were a key player in the revamp of the studio theatre at the Maltings Theatre in Berwick-upon-Tweed.


Black-light-case-study-placeholder-2

CASE STUDY

Edinburgh Fringe

2012’s Edinburgh International Festival and Fringe was Black Light’s most successful yet.


Black-light-case-study-placeholder-2

CASE STUDY

Lancaster University

Service: Installations

Sector: Education

We installed an external lighting system at the recently completed, £20m sports centre at Lancaster University.


Dsc_1048

CASE STUDY

Coltness High School

We installed a full package of stage lighting, sound, AV and recording studio equipment at Coltness High School in Wishaw, North Lanarkshire.